STATISTICS OF CENTERS IN CGCN CONTRACT IN 2021
No. |
Contract Name |
Implementation time |
1. |
Ultrasonic inspection of welding seams, mechanical testing of steel for A Luoi Hydropower project |
2021 |
2. |
Testing and assessing the ability to operate and the jacking system Nguyen Van Troi bridge, Da Nang city |
2021 |
3. |
Reporting on repair of Nguyen Van Troi bridge to raise and lower the bridge on holidays, Tet and weekends to serve people and tourists |
2021 |
4. |
Quality inspection of construction before operation: Project of intersection with different level of road No. 2, Southern Urban Area of Tuy Hoa City - Nguyen Van Linh Street |
2021 |
5. |
Consulting on inspection of the project of Renovating the intersection west of Tran Thi Ly bridge |
2021 |
6. |
Quality inspection of Co Co bridge in the road and Bridge over Co Co river project |
2021 |
7. |
Experimenting bored piles for Sala Complex Hotel |
2021 |
8. |
Experimenting piles of Song Hieu Bridge - Quang Tri province |
2020-2021 |
9. |
Experimenting with bored piles at the Danang Museum |
2021 |
10. |
Static compression test of piles of Hoa Lien Water Plant |
2020-2021 |
11. |
Experimenting with bored piles at the Organ Transplantation Center and Stem Cell Transplantation, Da Nang Hospital |
2021 |
12. |
Experimenting bored piles at the neurosurgery center, orthopaedics and traumatology, Da Nang hospital |
2021 |
13. |
Experimenting with soil cement piles for improving the water environment in the East of Son Tra district |
2020-2021 |
14. |
Experimenting with bored piles for Aria Non Nuoc luxury resort. |
2020-2021 |
15. |
Experimenting bored piles North Quang Nam Domestic solid waste processing factory in Ai Nghia Town - Dai Loc - Quang Nam |
2021 |
16. |
Experimenting with bored piles at Medical Centers in Son Tra district |
2021 |
17. |
Experimenting bored piles of Thanh Nam bridge - Hoi An city |
2020-2021 |
18. |
Package of consulting and inspection of road 675A Kon Tum |
Until 2022 |
19. |
Monitoring the sand embankment project - Quang Ngai |
Until 2022 |
20. |
Inspecting the construction of the road from the center of Mang Pen commune to Dak Y Bay village |
Until 11/2021 |
21. |
Quality inspection of bridge construction across Lai Giang canal, Binh Dinh |
Until 11/2021 |
22. |
Inspection of Nguyen Tri Phuong and Trung Luong bridges |
Until 07/2021 |
23. |
Vibration measurement of the project to renovate the cluster of intersections to the west of Tran Thi Ly bridge |
Until 07/2021 |
24. |
Quality inspection of the current status of Dien Bien Phu Tunnels |
Until 01/2021 |
25. |
Making a survey and preparing technical report on repair of Tra Bong Bridge |
Until 04/2021 |
26. |
Anchor experiment, experiment of materials and structures ……. |
Until 12/2021 |
27. |
Supplying materials for manufacturing trunks and branches of power plant under contract No. 07-77/DT-CNL-CNCK for Danang energy conversation and Technology consultant center |
25/01/2021-14/06/2021 |
28. |
Contract No. 01/2021/HD-TVXD Assessing the quality of the water canal system under the PleiKeo irrigation project, Ayun commune, Chu Se district, Gia Lai province |
5/01/2021 |
29. |
Quality inspection of Golf Range project at Binh Tien tourist area, Binh Tien village, Cong Hai commune, Thuan Bac district, Ninh Thuan province |
05/05/2021 |
30. |
Contract No. 02/2021/HD-TVXD Assessing the quality of the water canal system under the PleiKeo irrigation project, Ayun commune, Chu Se district, Gia Lai province |
5/6/2021 |
31. |
Contract for construction consultancy to load testing of bridge after repairing in Tam Ky bridge project, Quang Nam province |
8/7/2021 |
32. |
Construction consultancy contract for quality inspection of Huong So Kindergarten (Phase 1), Hue city - Serving the relocation of residential areas in area I of the Hue Citadel relic, due to foundation subsidence |
29/07/2021 |
33. |
Operating and operating instructions for the wastewater treatment system of Vinh Duc General Hospital Joint Stock Company |
2021 |
34. |
Checking the quality of wastewater samples |
2021 |
35. |
The periodical report of monitoring environment. |
2021 |
36. |
Analysis of wastewater samples |
2021 |
37. |
Checking lake water quality according to contract: 09/2020/HD-MT on April 1st, 2020 |
2021 |
38. |
Checking the quality of wastewater samples |
2021 |
39. |
The report of monitoring environment. |
2021 |
40. |
The report of monitoring environment. |
2021 |
41. |
The report of monitoring environment. |
2021 |
42. |
The report of monitoring environment. |
2021 |
43. |
The report of monitoring environment. |
2021 |
44. |
The report of monitoring environment. |
2021 |
45. |
The report of monitoring environment. |
2021 |
46. |
Report on completion of Adamo Hotel wastewater treatment system and Alisia Hotel connection file |
2021 |
47. |
The report of monitoring environment. |
2021 |
48. |
The report of monitoring environment. |
2021 |
49. |
Checking the quality of wastewater samples |
2021 |
50. |
Checking the quality of wastewater samples |
2021 |
51. |
Checking the quality of wastewater samples |
2021 |
52. |
Checking the quality of wastewater samples |
2021 |
53. |
Checking the quality of wastewater samples |
2021 |
54. |
Checking the quality of wastewater samples |
2021 |
55. |
System warranty cost for the period from 10/6/20 to 10/9/20 according to contract 01/2018/HDMT-VH |
2021 |
56. |
The report of monitoring environment. |
2021 |
57. |
The report of monitoring environment. |
2021 |
58. |
The report of monitoring environment. |
2021 |
59. |
The report of monitoring environment. |
2021 |
60. |
The report of monitoring environment. |
2021 |
61. |
The report of monitoring environment. |
2021 |
62. |
The report of monitoring environment. |
2021 |
63. |
Checking the quality of wastewater samples |
2021 |
64. |
Surveying, analyzing and evaluating the cause and status of damaged equipment due to lightning strikes |
2021 |
65. |
Thematic training on calculation, installation, testing and calibration of relay protection systems, transformer substations and generator sets and SCADA system training, advanced PLC programming instructions for hydro power plants |
2020-2021 |
66. |
Surveying, calculating and providing adjustment parameters Relay of 22kV stations Hai Van tunnel - Phase 2 |
2020-2021 |
67. |
Items Installing landmarks in the power grid corridor for site clearance compensation of DZ project and 110/22kV Krong No substation (Part DZ 110kV) |
2017-2021 |
68. |
Training on operation of the power system for the shift leader of the Control Center of Se San4 Hyro Power Plants and Sesan 4 Solar Power Plants |
2021 |
69. |
Provide data logger (Data logger) used for CSO seperation wells |
2019-2021 |
70. |
Training on basic awareness on implementation of operation management, equipment repair and maintenance according to CBM method under the training program, training on technical topics in 2021 for technical staffs and technicians of Da Nang Electricity |
2021 |
71. |
Training, introducing working principles of relay protection devices of Recloser, RMU, LBS devices to popularize 22KV distribution grid under the training program on technical topics in 2021 for technical staff and technicians of Electricity Da Nang. |
2021 |
72. |
Training on the contents of relay protection in the power system |
2021 |
73. |
Surveying, designing and estimating the Scada telecommunications system under the project to build a road tunnel through Deo Ca - National Highway 1, Phu Yen province and Khanh Hoa province |
2014-2021 |
74. |
Consultancy, survey, technical design and the total of construction cost estimate under the project of road tunnel construction through Deo Ca - National Highway 1, Phu Yen province and Khanh Hoa province |
2015-2021 |
75. |
Setting up a project to build 110KV Deo Ca substation under the project of building road tunnels through Deo Ca - National Highway 1, Phu Yen province and Khanh Hoa province |
2014-2021 |
76. |
Providing construction technical services to connect SCADA system to Solar Roof Powe in Lot B2-1, Phu Bai Industrial Park to B34 |
2021 |
77. |
Training on load forecasting, renewable energy and security assessment of short, medium and long term power system. |
2021 |
78. |
Providing software training and SCADA programming control to connect and monitor via new technology 4.0 for Hoa Lien water plant. |
2021 |
79. |
Training course on analyzing and segmenting faults and abnormalities on the power grid and training on calculation and analyzing operating method (PSS/E software) |
2021 |
80. |
Training SCADA system for hydropower plants and applied neural networks under contract No. 2432021 /HD-TDDN – RCEE dated December 17th, 2021 |
2021 |
81. |
Training, exploiting and analyzing data of Relay protection system for officers and employees of Dak Nong Aluminum Company - TKV under contract No. 890/2021/HD/DNA-TTNCD dated October 26th, 2021 |
2021 |
82. |
Survey, creating map flooding downstream of the dam and emergency response plans of 20 large and medium reservoirs (Quang Ngai province) |
23/12/2020 -12/2022 (ongoing) |
83. |
Building database of dams, water reservoirs and equipment, database management software (Quang Ngai province). |
15/01/2021 -12/2022 (ongoing) |
84. |
Surveying topography and assessing the influence of highways on flooding in Quang Ngai province and solutions. (Quang Ngai province) |
31/08/2021 -12/2022 (ongoing) |
85. |
Consulting, calculating, operating and regulating inter-reservoirs on Vu Gia - Thu Bon river basin in the rainy and flood season in 2021. |
01/09/2021 -31/12/2021 (ongoing) |
86. |
Developing a plan for natural disaster prevention in Quang Binh province for the period of 2021-2025. |
15/09/2021- 12/2022 (ongoing) |